
Mine Tailings Dams
Stable, safe work surfaces across tailings ponds — replacing unstable catwalks and carrying pumps, penstock platforms and pipework.
DWG XW-01 · Industrial Marine
Manufactured in USA and Europe under ISO quality control and available worldwide.
A bulk-shippable industrial marine floating walkway, pontoon, dock, pier, jetty and platform — engineered for mine tailings dams, wetlands, dredging and industrial marine applications.
Walkway · 300 mBarrier 6 m × 300 mSpec sheet · 02
Manufactured from stainless steel, aluminium and FRP, combined together for unrivalled resistance to extreme conditions — from high UV to pH between 2 and 12.
Unsinkable HDPE cells — never polyethylene foam or polystyrene.
03 / Applications

Stable, safe work surfaces across tailings ponds — replacing unstable catwalks and carrying pumps, penstock platforms and pipework.

The folding pivot walkway bends to follow the dredger. A 20,000 kg pull load on the dredging pivot keeps the structure intact.

FRP and stainless steel withstand acids, alkaline water, petroleum and UV — proven in an oil clean-up deep in the Peruvian Amazon.
Also forMine Storage FacilitiesReturn Water DamsIndustrial Marine
04 / Walkway Designs
Once assembled, Xrosswater walkways are immensely strong, lightweight and very durable. Standard walkways use aluminium frames, stainless steel fittings, FRP handrails and HMWPE floats.
Option 01FRP & Aluminium
Best value for money: strong, lightweight, clean lines and fully pre-drilled for fast assembly. Aluminium can be extruded anywhere in the world and keeps a recoverable re-melt value at end of life.
Option 02FRP & Stainless steel
For extreme corrosion, extreme climate and high theft risk. FRP/GRP grating, 316 stainless brackets and fasteners — used for a 140 m gold mine project in Ghana and at Taseko’s Florence Copper mine, Arizona.
Option 03Aluminium or FRP
Over 3 m wide when unfolded with double the buoyancy for pipes, cables and equipment. Folds to 2.5 m × 15 m to travel fully assembled on a normal flatbed truck. Each pivot section flexes ≈ 12°.
Platform configuration
The patented design is multi-configurable — whether the requirement is a walkway, pipe supports, pump platforms or a work platform.
Products & accessories
FRP composite deck, R 11 to R 13 (DIN 51130). Product of Germany.
FRP tube in bright safety yellow with black stanchions, max. 1220 mm high.
Helical, rock, chain web and duck bill anchors. Working load over 2,000 kg.
Oblong spread covers up to 10 m of walkway, up to 124 lumens per watt.
6 ft pole, 1 HP motor — keeps a range of about 8 m ice-free.
The pivot walkway pivots 10° over a 360° circumference.
Pre-formed and pre-drilled. 2–3 fitters build one 3 m × 1.5 m section in ≈ 25 minutes.
Weatherproof junction box, −40 °C to 85 °C, stainless hardware.
05 / Comparison
These two markets are not easily defined and often glossed over. Our comparison chart helps you make an educated decision — one that performs best, serves you longest and saves you money.
See the comparison chart
06 / Worldwide Delivery
Components are pre-formed, pre-drilled and freighted either assembled or in crates, with all necessary fasteners and tools included — for rapid assembly and quick deployment anywhere in the world. On-site assembly training is offered.
Projects completed all over Sub-Saharan Africa, the Amazon jungle, Arctic Canada, the mountains of Asia and South East Asia.

Option 1
Ready To Assemble
All fittings and components packed in crates of 21 m × 1.5 m, with a jig and all specialised tools. Ideal for 200 m+ with a local assembly team. One 3 m section in ≈ 25 minutes.
Option 2
The most popular option
Sections and handrails are assembled and stacked inside the container. Two fitters attach handrails and join the walkway in ≈ 15 minutes.
Option 3
Handrails, LED lights, de-icers fitted
Best when site costs are high, climate is unfavourable and quick execution is required — typically the pivot (snake) walkway or the foldable heavy lift walkway.


07 / Projects
25+ projects · 13 countries · 5 continents













Northern British Columbia · Canada300 m walkway plus a 6 m deep × 300 m tailings barrier to keep sediment out of the pump. Designed, supplied, assembled and installed in only 10 weeks.
08 / About Us
Our company, Xrosswater
The founder of our company accumulated more than 35 years of experience in the industrial marine market — from sailing yachts across oceans in the 80’s to commercial shipping, oil and gas platforms, marine engineering, high seas salvage, rescue, diving services, Antarctic expeditions and special military establishments in Europe and Africa.
Through this experience we identified a market need: a floating walkway system designed for industrial use, with industrial strength, that can be shipped anywhere in the world in component form — offering safe, stable work surfaces and eliminating very high shipping costs through clever design.
We are innovators, manufacturers and suppliers of high quality floating industrial structures, using material with unrivalled resistance to UV, petroleum, acids and alkaline.

Fabrication / assembly partners
Understanding the need to support local industry, Xrosswater produces and fabricates part of the product at different locations around the world.

09 / FAQ
Approx. 850 kg per section. When linked to the walkway at either end, buoyancy increases by approx. 25% to approx. 1,000 kg.
Approx. 1,750 kg per section.
The material can operate from minus 40 °C to +80 °C, confirmed by a MIL SPEC test certificate.
Tested to DIN 51130:2004-06 — corrected total average acceptance angle 36.5°, rating group R 13.
The pivot walkway can pivot 10 degrees over a 360 degree circumference.
Yes, it can be made totally unsinkable. For environmental reasons we use HDPE cells — not polyethylene foam or polystyrene, which are not biodegradable or recyclable. All commercial walkways supplied to Canada are unsinkable as per Canadian law.